Zhong Lun Law Firm has advised China Energy Engineering Group, Guangdong Electric Power Design Institute (GEDI) on the $768 million construction of power plant Block 7 in TPP Tuzla project in the Federation of Bosnia and Herzegovina (FBiH).
According to the firm, this is the largest electricity project and the most important investment in FBiH since the 1990s. It also marks a breakthrough made by Chinese construction companies in East-Central Europe.
The Zhong Lun team is led by partner Wei Sun.